The Niger Delta Power Holding Company (NDPHC) has begun the rehabilitation of the 225MW Gbarain Power Plant in Bayelsa State. The project, which was handed over to a joint venture between TILT Energy Limited and Schneider Electric, focuses on replacing the Power Control Module (PCM) that was destroyed by a fire in 2020. Officials identified the plant as a strategic asset near gas supplies and prioritized its repair to boost national electricity generation. The contractors have committed to completing the rehabilitation within 12 months.