The Transmission Company of Nigeria (TCN) has declared force majeure on the Oworonshoki and Lekki substations following severe flooding caused by persistent rainfall in Lagos. The Oworonshoki facility is currently out of service after floodwater submerged critical power transformers and cables, while engineers are working to drain the Lekki substation. This disruption is expected to affect electricity supply in parts of Lekki, Ajah, Ibeju-Lekki, Ogudu, Gbagada, Alapere, and Bariga.
Separately, the Nigerian power sector is focusing on expanding prepaid metering to address long-standing revenue and billing challenges. Data from the Nigerian Electricity Regulatory Commission shows that electricity distribution companies collected N801.16 billion between January and April 2026, a six percent increase attributed to improved metering adoption. Power Minister Joseph Tegbe has reiterated the government’s commitment to accelerating the nationwide rollout of seven million meters to eliminate estimated billing, enhance collection efficiency, and reduce systemic losses across the industry.