The Nigerian Independent System Operator (NISO) has restored full functionality to the national grid following a localized disturbance on the 330kV transmission network that occurred on Monday, October 19, 2026. The disruption, which began at approximately 12:40 p.m., prompted immediate intervention from NISO and the Transmission Company of Nigeria (TCN). Authorities confirmed that emergency measures successfully stabilized the system, contradicting social media reports of a widespread national blackout. NISO stated that the impact was limited to specific network sections and remains committed to maintaining grid stability.